(1)
ANALISA WAKTU PENYELESAIAN PADA PROYEK PENINGKATAN JALAN KONSTRUKSI HRS BASE KELURAHAN BATUPLAT KOTA KUPANG DENGAN METODE EARNED VALUE. ETERNITAS 2024, 3 (2), 8-15. https://doi.org/10.30822/eternitas.v3i2.4221.